04 / QUALITY CONTROL
Product quality control in China
A pre-shipment inspection makes corrective action possible while the goods are still with the manufacturer. The scope is based on the approved specification, reference sample, packaging requirements and agreed acceptance criteria.
Why is inspection after delivery too late?
Once the balance is paid and the goods have shipped, corrective work is slower, more expensive and harder to enforce. Inspection in China cannot guarantee that every defect is absent, but it provides documented evidence for a release, rework or re-inspection decision.
Inspection scope
- quantity, model and marking verification
- workmanship checks on randomly selected units
- measurements, functional tests and specification comparison
- retail and transport packaging checks
- nameplates, labels and shipping documentation
- photographic report and result against agreed criteria
Inspection stages
- 01
Checklist
We convert requirements and product risks into clear inspection points.
- 02
Inspection
The inspector samples goods and performs visual, dimensional and functional checks.
- 03
Findings
Defects are classified and critical questions are discussed with the client.
- 04
Decision
The report supports shipment, rework or re-inspection decisions.
Control before payment release
You receive photographs, test results, defect counts and a clear summary. For series-produced goods we can apply an AQL sampling plan; machinery is assessed against a project-specific acceptance checklist.
Need an inspection before shipment?
Send the specification, reference photos and production-ready date. We will recommend the inspection type.
Free consultation